Assembly instructions - KLARO GmbH
Assembly instructions - KLARO GmbH
Assembly instructions - KLARO GmbH
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Assembly</strong> <strong>instructions</strong> for <strong>KLARO</strong> retrofit kitsFigure 26: Attaching the downpipe and the integrated sampling unit to the horizontal traverse by means of astainless steel clamp4.4. Air hosesAir hoses are required to establish a connection between the concrete tank and the machinecabinet. These hoses must be ordered separately in the respectively required length. In orderto avoid mixing up the hoses when connecting them, we deliver the hoses in different colours– according to the colour codes used for the lifts in the tank.Valve Component Colour1 Charging red2 Aeration blue3 Discharging black4 Excess sludge lift whiteAs a matter of principle, the air hoses must be attached in such a manner that they can beprevented from kinking. The hose must be either secured by means of a pipe clamp attachedto the cone (Figure 27) or fixed to the downpipe by means of a cable tie in a smooth curve(Figure 28).14 <strong>KLARO</strong> <strong>GmbH</strong>