12.07.2015 Views

Assembly instructions - KLARO GmbH

Assembly instructions - KLARO GmbH

Assembly instructions - KLARO GmbH

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Assembly</strong> <strong>instructions</strong> for <strong>KLARO</strong> retrofit kitsFigure 19: Piping for the aeration unit with 3 discsFigure 20: Piping for the aeration unit with 4 discsAfter the aeration unit has been placed in the tank, the supplied concrete weight is threadedvia the vertical downpipe for vertical fixation and lowered to the bottom.Figure 21: Tank diameter of 2 mFigure 22: Tank diameter of 2.5 mImportant information about the anchor bolt assembly:1. Make a borehole.2. Clean the borehole.3. Drive the bolt into concrete up until the seat depthmark.4. After the nut has been tightened, screw on the pipeclamp.12 <strong>KLARO</strong> <strong>GmbH</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!