PAGE 14 | INFORM NO. 3 / 2011<br />

Unrivalled safety and reliability<br />

DUKTUS PIPES fOR fIRE-ExTINGUIShING WATER PIPELINES<br />

The “Sonnhalde” area in Switzerland’s Emmental<br />

region is well equipped to deal with<br />

fires<br />

To enable adequate quantities of fire-extinguishing<br />

water to be supplied in the event of a fire, the<br />

municipalities of Rüderswil and Lützelflüh in the<br />

canton of Berne have connected the Sonnhalde<br />

residential area to the public water supply. Sonnhalde<br />

was previously supplied by the Sonnhalde<br />

private water supply association, but this was<br />

unable to provide enough water for fire-extinguishing<br />

purposes. Plans for the project were<br />

worked out by the consulting engineers H.R.<br />

Müller AG of Bremgarten in the canton of Berne.<br />

The laying work had to be done in winter, when<br />

vegetation was sparse, and in the severe cold. An<br />

added difficulty was that the soil conditions varied.<br />

<strong>Duktus</strong>’ sales and distribution partner<br />

HAGENBUCHER was able to offer the right<br />

grade of pipe for these difficult conditions. Ductile<br />

iron pipes with a ZMU external coating and BLS®/<br />

VRS®-T joints were equal to these requirements in<br />

every respect.<br />

From an existing DN 125 pipeline, a 650 metre<br />

long DN 125 hydrant pipeline was laid to the municipal<br />

boundary of Lützelflüh as a first stage.<br />

Despite of the biting cold, the laying work, which<br />

was done by Anton Siegenthaler of Schwanden in<br />

The municipality of Rüderswil in winter<br />

A 650 metre long hydrant pipeline of <strong>Duktus</strong> DN 125 pipes ensures<br />

that there is adequate capacity for supplying fire-extinguishing<br />

water<br />

Laying of the hydrant pipeline in the Sonnhalde area in the<br />

Emmental region<br />

the Emmental region, was completed to an impeccable<br />

technical standard and on time, and the<br />

two Emmental municipalities now have a safe and<br />

reliable system for supplying fire-extinguishing<br />

water and an up-to-date way of fighting fires.<br />

The Škoda factory in mladá Boleslav puts its<br />

money on fm Approval<br />

In the course of work to expand the Škoda’s main<br />

site in Mladá Boleslav in the Czech Republic, it<br />

was necessary for fire-fighting systems to be expanded.<br />

The car maker will expand its capacity at<br />

the home works by 2012. In planning the fire protection,<br />

emphasis was placed on having the very<br />

highest quality.<br />

<strong>Duktus</strong> litinové systémy was able to supply exactly<br />

what the customer asked for: pipelines of ductile<br />

iron pipes with FM Approval. Jirí Mlynár, <strong>Duktus</strong><br />

Sales Manager in the Czech Republic, said: “Expansion<br />

is an important step in Škoda’s strategy<br />

for growth. The new M13 building was to be<br />

equipped with a safe and reliable fire protection<br />

Crucial to the placing of the order was FM Approval, which the<br />

<strong>Duktus</strong> pipes have<br />

190 metres of ZMU pipes was laid for the fire-extinguishing water<br />

pipelines in the Škoda plant<br />

system and FM Approval was a prerequisite for<br />

the placing of an order for the pipeline systems.<br />

This was a requirement that <strong>Duktus</strong> was able to<br />

meet. We supplied 190 metres of DN 300 nominal<br />

size ductile iron pipes with a ZMU external<br />

coating and the proven BLS®/VRS®-T joint. The<br />

ZMU coating stops the cast material from coming<br />

into direct contact with the soil, and this ensures<br />

that there is outstandingly good protection<br />

against leakage currents. This was also an explicit<br />

requirement which the client had, in addition to<br />

the FM Approval.”<br />

The first sod was turned to begin the expansion<br />

on 15 April 2011, on the occasion of the celebrations<br />

to mark the 20th anniversary of the association<br />

with Volkswagen. The work of laying the pipelines<br />

for fire-extinguishing water, which was carried<br />

out by KSK Praha, went off without a hitch<br />

and was completed in September 2011. <strong>Duktus</strong><br />

had already made a good impression in the Bohemian<br />

town of Mladá Boleslav in the spring of<br />

2011 when it supplied ductile iron drinking water<br />

pipes (see our report in <strong>inform</strong> 2/2011).<br />

A view of part of the Škoda plant in Mladá Boleslav