12.07.2015 Views

EN / ACS800-31/U31 Hardware Manual - Simark Controls

EN / ACS800-31/U31 Hardware Manual - Simark Controls

EN / ACS800-31/U31 Hardware Manual - Simark Controls

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

83Installation checklistWhat this chapter containsInstallation checklistThis chapter contains an installation checklist.Check the mechanical and electrical installation of the drive before start-up. Gothrough the checklist below together with another person.WARNING! Only qualified electricians are allowed to commission the drive. Readand follow the Safety instructions on the first pages of this manual. Ignoring thesafety instructions can cause injury or death.Check...MECHANICAL INSTALLATIONThe ambient operating conditions are allowed. (See Mechanical installation, Technical data)The unit is fixed properly on a vertical non-flammable wall. (See Mechanical installation.)The cooling air will flow freely.The motor and the driven equipment are ready for start. (See Planning the electricalinstallation: Motor selection and compatibility, Technical data: Motor connection.)ELECTRICAL INSTALLATION (See Planning the electrical installation, Electrical installation.)The +E202 and +E200 EMC filter capacitors are disconnected if the drive is connected to anIT (ungrounded) system.The capacitors are reformed if stored over one year (refer to ACS 600/800 CapacitorReforming Guide [64059629 (English)].The drive is grounded properly.The mains (input power) voltage matches the drive nominal input voltage.The mains (input power) connections at U1, V1 and W1 and their tightening torques are OK.Appropriate mains (input power) fuses and disconnector are installed.Installation checklist

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!