12.07.2015 Views

EN / ACS800-31/U31 Hardware Manual - Simark Controls

EN / ACS800-31/U31 Hardware Manual - Simark Controls

EN / ACS800-31/U31 Hardware Manual - Simark Controls

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

22TaskCheck the insulation of the motor and the motorcable.SeeElectrical installation: Checking the insulation ofthe installationConnect the power cables.Electrical installationConnect the control and auxiliary control cables.Electrical installation, Motor control and I/Oboard (RMIO), Installation of AGPS board(Prevention of Unexpected Start, +Q950) andthe optional module manual delivered with themodule.Check the installation.Installation checklistCommission the drive.Start-up and use, appropriate applicationprogram firmware manualInquiriesAddress any inquiries about the product to the local ABB representative, quoting thetype code and serial number of the unit. If the local ABB representative cannot becontacted, address inquiries to the manufacturing facility.About this manual

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!