12.07.2015 Views

PLCHandler Programming Guide - Esco Drives & Automation

PLCHandler Programming Guide - Esco Drives & Automation

PLCHandler Programming Guide - Esco Drives & Automation

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>PLCHandler</strong> <strong>Programming</strong> <strong>Guide</strong>Appendix B: Error codesDefine Value DescriptionRESULT_FAILED -1 Action erroneous.More exact error values canbe requested by::GetLastError() resp. by::GetState().RESULT_OK 0 Action successfulRESULT_PLC_NOT_CONNECTED 1 PLC not connectedRESULT_PLC_LOGIN_FAILED 2 Login to PLC has failedRESULT_PLC_NO_CYCLIC_LIST_DEFINED 3 No cyclic list has been foundRESULT_PLCHANDLER_INACTIVE 4 <strong>PLCHandler</strong> is inactiveRESULT_LOADING_SYMBOLS_FAILED 5 Loading of the symbols hasfailedRESULT_ITF_NOT_SUPPORTED 6 The defined communicationinterface is not valid or notsupportedRESULT_COMM_FATAL 7 Communication error occurredduring actionRESULT_NO_CONFIGURATION 8 Wrong or erroneousconfiguration of the<strong>PLCHandler</strong>RESULT_INVALID_PARAMETER 9 Invalid parameterRESULT_ITF_FAILED 10 Communication interface notresp. incorrectly installed (e.g.Gateway Dlls not available)RESULT_NOT_SUPPORTED 11 Method not yet supportedresp. implementedRESULT_EXCEPTION 12 Exception occurred duringactionRESULT_TIMEOUT 13 Timeout wurde überschrittenRESULT_STILL_CONNECTED 14 PLC already connected (at afurther ::Connect() call)RESULT_RECONNECTTHREAD_STILL_ACTIVE 15 Reconnect Thread alreadyactiveRESULT_PLC_NOT_CONNECTED_SYMBOLS_LOADED16 Symbols available offline 3S - Smart Software Solutions GmbH<strong>PLCHandler</strong> Programmming <strong>Guide</strong>.doc Page 13 of 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!