12.07.2015 Views

wembley-plan-app (small) , item 9. PDF 8 MB - Meetings, agendas ...

wembley-plan-app (small) , item 9. PDF 8 MB - Meetings, agendas ...

wembley-plan-app (small) , item 9. PDF 8 MB - Meetings, agendas ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Wembley Area Action Plan - Proposed Submission Version63Transport 6Empire Way / Fulton Road - capacityimprovements have been secured through anexisting Outline Planning Permission. Agreedland take is identified at Appendix C.Wembley Park Drive / Empire Way - capacityimprovements have been secured through anexisting Outline Planning Permission. Agreedland take is identified at Appendix C.New junction between North End Road /Bridge Road – land take requiredBridge Road / Forty Lane –Feasibility studyrequiredunderway and a contribution for thejunction improvement has been securedthrough an existing Outline PlanningPermission.6.17 Any improvements to the Transport forLondon Road Network (TLRN) or the StrategicRoad Network (SRN) will have to be consulted and<strong>app</strong>roved by TfL.6.18 In addition, to enable two way operation onFifth Way and South Way a number of junctionimprovements will be required. These include:Fifth Way/Atlas RoadFifth Way/Fulton RoadFifth Way/First Way/Engineers Way (land takerequired)South Way/First Way6.19 Plans showing the land required for theseimprovements are shown in Appendix C. Whereland outside of the highway boundary is sought forimprovements the acquisition will be sought byagreement, but Compulsory Purchase proceduresmay be utilised where it is considered necessaryto address existing deficiencies and deliver thecouncil’s Core Strategy objectives.WEM 13Road and Junction Improvements toStadium Access Corridor and WesternAccess CorridorThe council will develop improved highwayaccess for car travel from the North CircularRoad by improving the Stadium AccessCorridor (Great Central Way/South Way) andthe Western Access Corridor (Atlas Way/FifthWay/Fulton Road) with South Way beingwidened, and two way working restored to bothSouth Way and Fifth Way. The remaining partsof the gyratory system will be returned totwo-way working as development comesforward on adjacent sites. A new roadconnection will be provided from North EndRoad to Bridge Road to provide an alternativeroute through Wembley Park.WEM 14Western Highway CorridorThe council will develop improved access forpublic transport, pedestrians and cyclists,especially from Forty Lane to Ealing Road viaEmpire Way and Wembley High Road.Junction and highway improvements alongthis route are required to facilitate developmentand will be designed to favour these non carusers as well as improve general highwayperformance, including for non-car users. Anyimprovements would need to be supported bymodelling.Land for improvements will be determined andsecured when <strong>plan</strong>ning consent is granted forre-development of the site. This will ensurethat on re-development, improvements forpublic transport users, pedestrians and cyclistwill be secured.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!