12.07.2015 Views

wembley-plan-app (small) , item 9. PDF 8 MB - Meetings, agendas ...

wembley-plan-app (small) , item 9. PDF 8 MB - Meetings, agendas ...

wembley-plan-app (small) , item 9. PDF 8 MB - Meetings, agendas ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Wembley Area Action Plan - Proposed Submission Version153Appendix C: Land Take Maps 2020.1 The following are maps detailing the land take requirements for highway and junction improvements which form integral parts of the longer term transportstrategy for Wembley, which is required to facilitate development and regeneration within the action <strong>plan</strong> area. Certain land requirements are already beingprogressed, whilst others will be required on re-development of the sites. The specific details of the land required for transport improvements associated witheach site are described in chapters 12-15. Map 20.1 shows the land required for the junction improvement at Empire Way / Engineers Way, which affects SiteW12 (North West Lands).Map 20.1 Land take required from W12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!