12.07.2015 Views

wembley-plan-app (small) , item 9. PDF 8 MB - Meetings, agendas ...

wembley-plan-app (small) , item 9. PDF 8 MB - Meetings, agendas ...

wembley-plan-app (small) , item 9. PDF 8 MB - Meetings, agendas ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Wembley Area Action Plan - Proposed Submission Version135Wembley Eastern Lands 15Brook including the delivery of open space and riverrestoration work to improve ecological diversity andclimate change adaptation and help meet the WaterFramework Directive.Euro Car PartsContext15.8 The site consists of the retail warehouse ofEuro Car Parts, its car park and the adjacentvehicle /skip site for Generay. The site is adjacentto Wealdstone Brook and is within the WembleyGrowth Area.Planning History15.9 There is no relevant <strong>plan</strong>ning history for thissite.Site W 27Euro Car Parts(1.35 hectares)The site is <strong>app</strong>ropriate for mixed usedevelopment including office, leisure,residential, student accommodation, managedaffordable workspace (including for creativeindustries), hotel and community use. Thecreation of an <strong>app</strong>ropriate buffer between theexisting industrial and new non-industrial useswill b required.The site lies within the Strategic Cultural Areawhere leisure, tourism and cultural uses areparticularly encouraged.Biodiversity improvements and flood riskadaptation measures will be sought whendevelopment proposals come forward. A bufferstrip of at least 10 metres wide should beretained for a publicly accessible brook sidepark to allow for a cycle way/footpath,associated landscaping, tree <strong>plan</strong>ting andstreet furniture,as agreed in consultation withthe Environment Agency and Brent Council.Development should allow for a nodal pointon the brook where the buffer strip should bewidened to about 20 metres. Removal of partof the canalised wall and regrading of the bankto provide a more natural setting will besought. The site would be suitable for housingfacing the river providing the river restorationwork is carried out. Development will berequired to contribute towards the restorationwork.The majority of the site is in flood zone 1;however there are <strong>small</strong> sections of flood zone2 adjacent to the Wealdstone Brook. Thebuffer strip will remove the developable areaof the site wholly into flood zone 1. Proposalsmust be accompanied by a Flood RiskAssessment. Development should not impedeflood water flows and should not increasesurface water run-off or reduce water storage.Land is required for junction improvement atFulton Road / Fifth Way / Engineers Way onredevelopment of the site as shown on theproposals map, and in <strong>app</strong>endix C.Indicative Development Capacity - 360 unitsJustification15.10 This is an opportunity for a mixed usescheme in an important location delivering a mixof employment opportunities and meetingresidential needs. The site is directly opposite theproposed primary school site. Development at thissite can improve the setting for the school and theStadium and can contribute towards an improvedsetting for the Wealdstone Brook, including thedelivery of open space and river restoration workto improve ecological diversity and climate changeadaptation and help meet the requirements of theWater Framework Directive.First WayContext15.11 A mix of industrial, storage, warehouseuses and a waste facility to the east of WembleyStadium. The site is in Wembley Growth Area andborders the Wembley Strategic Industrial Location.It is currently accessed at various points from theone way, gyratory system.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!