Rev. 9 December 15, 2012SECTION 14 92 00HOSPITAL WIDE PNEUMATIC TUBE SYSTEMC. Tube ends shall be joined by either drive sleeves or a bolted coupling. Bolted sleeves shall be used at joint tomajor components.D. All tubing runs through areas determined to be noise sensitive shall be insulted with sound insulating glassfiber at least 1½" one pound density type with Aluminum foil backing.2.8 POWER SUPPLY AND DISTRIBUTIONA. Power, control wiring <strong>and</strong> conduit required shall be provided by pneumatic tube manufacturer, except primarypower source for main control <strong>and</strong> blowers only.B. Power <strong>and</strong> control wiring shall be installed in steel conduit.1. 1” conduit for 50 conductor com cable,2. ¾” conduit for power cable 1 red, 1 black, 10 gauge cable,3. ¾” conduit for critical care system (4 twisted pair).C. System power shall be turned on <strong>and</strong> <strong>of</strong>f <strong>and</strong> distributed <strong>and</strong> monitored by master control unit.D. System design shall facilitate connection <strong>of</strong> emergency power at minimum number <strong>of</strong> locations to providecontinuous operation <strong>of</strong> entire system on emergency power. System supplier shall list connections toemergency power <strong>and</strong> describe in detail.2.9 BLOWER PACKAGEA. One exhauster package shall be installed for each branch. It shall provide motivating force to transport carrierwithin transmission tubing.1. Package shall be capable <strong>of</strong> delivering either vacuum or pressured air to transmission tubing. It shall beautomatically controlled from Master Control.2. Exhauster unit shall be complete with air sensing devices <strong>and</strong> valves for controlling air flow <strong>and</strong> solidstate control logic for interfacing with Master Control Unit.3. Unit shall have sufficient capability (minimum 550 cfm) to move loaded carrier minimum twenty <strong>and</strong>maximum twenty-five per second through designed length <strong>of</strong> system except when selective slowdownis in operation. Deviation <strong>of</strong> supplier's system from this shall be described; <strong>and</strong> qualitative <strong>and</strong>quantitative information shall be given to substantiate deviation with submittal.4. Exhauster shall automatically shut down during periods <strong>of</strong> low activity <strong>and</strong> shall re-start automaticallywhen sending instruction is executed at station.B. The blower noise shall not exceed 85 decibels.C. Blower shall be 10 horsepower Swisslog provided regenerative blower.D. Submit a complete <strong>and</strong> detailed description <strong>of</strong> blower package.2.10 TRAININGA. Maintenance <strong>and</strong> operating personnel shall be instructed in-house on use, maintenance <strong>and</strong> operation <strong>of</strong> systemduring final seven days <strong>of</strong> installation.2.11 INSTRUCTION MANUALSA. Upon completion <strong>of</strong> installation <strong>of</strong> system, Contractor shall furnish three copies <strong>of</strong> Instruction Manual <strong>and</strong>Maintenance Manual including the following:1. Complete operating, trouble-shooting <strong>and</strong> preventive maintenance routines.2. Detailed spare parts list.TITLE OF PROJECT HERE149200-5UIHC # 20X-XXXTHE UNIVERSITY OF IOWA HOSPITALS AND CLINICSPOST BID CON. DOC.:DATE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!