Rev. 9 December 15, 2012SECTION 07550MODIFIED BITUMEN MEMBRANE ROOFING (SBS)1.06 QUALIFICATIONSA. Applicator:1. Company specializing in performing the work <strong>of</strong> this section with a minimum <strong>of</strong> five(5) years documented experience.2. Company certified by the membrane manufacturer for a minimum <strong>of</strong> three (3) years asan approved applicator <strong>of</strong> the products specified in this section.3. Company having workmen trained by the membrane manufacturer. These trainedworkmen shall perform the work.1.07 DELIVERY, STORAGE AND HANDLINGA. Deliver <strong>and</strong> store materials under provisions <strong>of</strong> Section 01610.B. Deliver materials in sufficient quantity to allow continuity <strong>of</strong> work.C. Coordinate delivery <strong>of</strong> materials with Owner so that minimal interruption <strong>of</strong> Owner'soperations occurs.D. Materials shall be stored in their original, tightly sealed containers or unopened packages, <strong>and</strong>shall be clearly labeled with the manufacturer's br<strong>and</strong> name <strong>and</strong> such identifying referencenumbers as are appropriate. Deliver materials to job site on pallets. Do not stack pallets.E. Materials shall be stored in a neat, safe manner, so as not to exceed allowable live load <strong>of</strong> thestorage area. Contractor shall not load pallets <strong>of</strong> material onto the ro<strong>of</strong> deck without approvalfrom the Architect/Engineer prior to loading. Disperse materials on ro<strong>of</strong> deck to avoidconcentrated loading.F. Store materials in dry, protected areas in an upright position. Control temperature <strong>of</strong> storageareas in accordance with manufacturer's instruction. Protect materials from freezing.G. Follow manufacturer's guidelines for required temperatures <strong>of</strong> material prior to application.H. Any materials damaged in h<strong>and</strong>ling or storage are not to be used.I. The Contractor shall assume full responsibility for the protection <strong>and</strong> safekeeping <strong>of</strong> materialsstored on Owner's premises.J. Store roll goods on ends only. Discard rolls which have been flattened, creased, or otherwisedamaged.K. Remove wet material from project site.L. Comply with fire <strong>and</strong> safety regulations.Modified Bitumen Membrane Ro<strong>of</strong>ing (SBS)UIHC #20X-0XX 07550-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!