12.07.2015 Views

city of delaware department of public utilities division of stormwater ...

city of delaware department of public utilities division of stormwater ...

city of delaware department of public utilities division of stormwater ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6. Extended Credit RequestI request to be considered for an extended credit based on the over design identified by thesecalculations and known downstream flooding conditions. I acknowledge that additional calculations may benecessary to qualify for an extended credit. (check the space If desired)ENGINEER'S CERTIFICATION:I hereby certify that the detention/retention facility(ies) has (have)been constructed in substantial conformance with pertinent designrequirements and that the detention/retention facility(ies) is(are) inan acceptable state <strong>of</strong> maintenance and repair. I further certify thatthese calculations, technical details and information providedreflect accurately the condition <strong>of</strong> the detention/retention facility atthe time <strong>of</strong> my inspection.Signature and Seal <strong>of</strong> PE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!