12.07.2015 Views

Apricus Solar Water Heating System Installation and Operation ...

Apricus Solar Water Heating System Installation and Operation ...

Apricus Solar Water Heating System Installation and Operation ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Apricus</strong> <strong>Solar</strong> Collector <strong>Installation</strong> & <strong>Operation</strong> Manual - USA15. <strong>Installation</strong> ChecklistThe following list is a guide only. Specific items will depend on the nature of the installation.ROOFCollector is facing due south, or as close to as possible.Manifold is not significantly shaded between 9 am - 3 pm.Manifold is not likely to be struck by falling objects such as branches, falling fruit, or other nearby objects° ° °Collector is installed at an angle of between 20 – 80 , preferably at 15-20 above latitude angle.In areas prone to large hail (> 20mm or3/4”), collector is installed at an angle of 40 or greater.°In areas prone to snow, collectors is installed at angle of 45 or greater.Tank <strong>and</strong> pump station are easily accessible <strong>and</strong> not blocking other equipmentCollector is attached to framework of suitable strength <strong>and</strong> wind loading has been fully considered.Framework has been reinforced as required.All piping is suitably insulated <strong>and</strong> any external piping is protected from UV damage <strong>and</strong> water ingress.All piping is held securely in place <strong>and</strong> will not vibrate or sag.Roof penetrations are well sealed <strong>and</strong> will not leak.If drain-back system, collector <strong>and</strong> piping are installed with $” per foot slope continuously to mech. roomPath of broken glass in case of collector storm damage has been considered <strong>and</strong> explained to thecustomer.Evacuated tubes have been cleaned.UTILITY ROOM<strong>System</strong> <strong>and</strong> expansion tank have been pressurized to the recommended level (Closed loop)<strong>System</strong> is free of air <strong>and</strong> flushed correctly with heat transfer fluid (Closed loop)<strong>Water</strong> quality is within allowable limits (Direct flow)Flow rates have been checked; peak, minimum <strong>and</strong> variable speed flow ratesAll piping is suitably insulatedPump station is mounted correctly <strong>and</strong> to suitable strength framework.Controller operation has been checked <strong>and</strong> turned to Automatic.Controller SD card has been turned ON.If direct flow system, frost protection has been turned ON.Pressure relief valves are in place <strong>and</strong> drain to suitable locationPlumbing is leak free - solar loop has been air pressure tested to 116 psi for at least 15min.Pump, controller <strong>and</strong> all electrical connections are protected from water ingress.CUSTOMER SERVICE<strong>System</strong> operation has been explained to customer<strong>Installation</strong> record form has been completed <strong>and</strong> copy provided to customer°All applicable items should be ticked for the installation to be considered completed <strong>and</strong> satisfactory.Copyright 2011 – <strong>Apricus</strong> Inc Doc: A7-05.4.1.4-PB-1.9 Page 90 of 126

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!