12.07.2015 Views

Apricus Solar Water Heating System Installation and Operation ...

Apricus Solar Water Heating System Installation and Operation ...

Apricus Solar Water Heating System Installation and Operation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Apricus</strong> <strong>Solar</strong> Collector <strong>Installation</strong> & <strong>Operation</strong> Manual - USA11.8. Freezinga) If the pump or controller fails or a power outage occurs, during an extended sub-zero period, a direct flow(water) system may suffer from freeze related damage. This can be indicated by no pump flow due to pipeblockage or, after the system thaws out, leaking due to a burst pipe.b) Exposed copper piping, particularly near elbows or connections is the most likely location for freezedamage to occur. Once the system thaws, leaks will need to be repaired.c) To repair, isolate flow to the collector or drain the system <strong>and</strong> repair/replace any damaged piping, then recommissionthe system. An air test is recommended before recommissioning. Refer to 7.10 <strong>and</strong> 8.9 forinstruction on draining the system.d) If freezing is a regular occurrence, a closed loop system is a better option for the climate <strong>and</strong> the systemshould be converted.11.9. Maintenance PlanIt is recommended that as a minimum the following maintenance plan is followed:Component Time Frequency InspectionInsulation 3 years Check for degradationController 3 years Check data-logger operation, system settings.Pump operation 3 years Check flow rates, pump noise, vibration etc<strong>Solar</strong> Collector 3 years Check tubes for any vacuum lossHeat Transfer Fluid 1 year Check appearance, pH <strong>and</strong> hydrometer reading.11.10. Maintenance EquipmentIn order to allow efficient completion of maintenance activities, the following equipment should be kept on site, ifapplicable to the system configuration.a) Automatic Air Vent - this should have been removed after initial filling of the system. It should be kept onsite in a sealed plastic bag, cable tied to the tank or pump station piping <strong>and</strong> marked as follows:“Automatic air vent for highest point of solar collector loop. DO NOT discard <strong>and</strong> DO NOT installpermanently.”b) Copies of the installation manuals, MSDS sheets <strong>and</strong> any other documentation supplied with thecomponents of the system.c) A copy of system diagram along with notes of any non-st<strong>and</strong>ard or notable aspects of the design. See<strong>Apricus</strong> OG-300 <strong>System</strong>s Manual for system diagrams. If the diagram is NOT present, develop a clear linedrawing of system.d) Labeling of key components <strong>and</strong> piping. See also 3.24.11.11. Replacement PartsFor all major component replacements, contact the local <strong>Apricus</strong> dealer or distributor or contact <strong>Apricus</strong> Inc. viaemail at office-usa@apricus.com or phone 877-458-2634.Copyright 2011 – <strong>Apricus</strong> Inc Doc: A7-05.4.1.4-PB-1.9 Page 83 of 126

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!