12.07.2015 Views

Apricus Solar Water Heating System Installation and Operation ...

Apricus Solar Water Heating System Installation and Operation ...

Apricus Solar Water Heating System Installation and Operation ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Apricus</strong> <strong>Solar</strong> Collector <strong>Installation</strong> & <strong>Operation</strong> Manual - USAe) Connection: The expansion tank connection is located on the lower, lefth<strong>and</strong> side of the pump station.The expansion tank should be connected to the pump station using the Onix pipe provided. The use ofTeflon tape on the threaded fittings is recommended.Step 1. Cut the Onix tubing to desired length with a sharp blade.Step 2. Thread the female adapter to the expansion tank.Step 3. Slip ring clamp onto the Onix tubing. Press barbed end of adapter into the Onix tubing (a littlewater on the barbs will help). Place ring clamp over center of barbs <strong>and</strong> release.Step 4. Thread the male adapter into the pump station. Tighten the expansion tank fitting with twowrenches taking special care not to stress the expansion tank support pipe.Step 5. Slip ring clamp onto the Onix tubing. Press barbed end of adapter into the Onix tubing (a littlewater on the barbs will help). Place ring clamp over center of barbs <strong>and</strong> tighten.NOTICEOnly make final expansion tank connection (Step 5) after system pressure test is complete<strong>and</strong> test pressure is released from the system.Expansion vessel may only be installed with pipe connection on top. Horizontal or invertedorientations are not acceptable.7.9. Fill <strong>and</strong> Pressurizea) Heat Transfer Fluid: The <strong>Apricus</strong> pump station is designed for closed loop configuration using a freezeresistance heat transfer fluid. Refer to Section 3.31 <strong>and</strong> Appendices 11-18 for information.Before commencing installation make a rough calculation of the volume of heat transfer fluid that will berequired, <strong>and</strong> what size buckets will be needed during the fill process.Each 1 foot of "” pipe = 0.025 GallonsEach 1 foot of #” pipe = 0.012 GallonsEach AP-30 solar collector = 0.19 GallonsExample: <strong>Installation</strong> of 50 foot of !” pipe <strong>and</strong> one AP-30 = 1.44 GallonsIn addition, you will need to consider the volume of the coil heat exchanger, if present. The coil volume isnormally provided by the tank manufacturer on the tank specification sheet.b) Charging Equipment: <strong>Apricus</strong> recommends using a professional charging station in order to streamlinethe process considerably.c) Follow this process to fill <strong>and</strong> pressurize the system:Step 1. Connect hoses (garden hose fittings) to fill (bottom) <strong>and</strong> drain (top) ports on pump.Step 2. Open the valves on both the drain <strong>and</strong> fill ports <strong>and</strong> turn the isolation valve between the fill/drain ports to the closed position (horizontal). Open the auto air vents on the highest point of theCopyright 2011 – <strong>Apricus</strong> Inc Doc: A7-05.4.1.4-PB-1.9 Page 67 of 126

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!