12.07.2015 Views

Apricus Solar Water Heating System Installation and Operation ...

Apricus Solar Water Heating System Installation and Operation ...

Apricus Solar Water Heating System Installation and Operation ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Apricus</strong> <strong>Solar</strong> Collector <strong>Installation</strong> & <strong>Operation</strong> Manual - USAd) Pressure Relief: The pressure relief valve is included as a safety device, designed to open at 75 psishould the system pressure rise to that level. This may occur if for example the expansion tank is not bigenough or some blockage occurs that prevent normal operation or extreme overheating occurs.e) Drain Pipe: The pressure relief valve drain pipe fitting is a 3/4” FPT connection. Install <strong>and</strong> tighten drainpipe fitting with two wrenches taking special care not to stress the pressure relief valve support pipe.WARNING- Pressure relief valve must NOT be blocked.- A drain pipe must be connected to the relief valve.- The drain pipe diameter must be no smaller than 3/4” <strong>and</strong> be able to withst<strong>and</strong>temperature of up to 230° F (110°C).- Pressure relief piping must meet local codes7.6. Controller Connectionsa) The <strong>Apricus</strong> controller comes pre-installed on the left side of the pump station.b) Remove the controller cover by removing the screw with a small straight blade or star screwdriver. Pullthe cover straight off to expose the electrical (left) <strong>and</strong> sensor (right) terminal connections.c) Install system temperature sensors. (See section 6.4)Step 1. Insert collector sensor (RED high temp wire) into collector sensor well on the solar return sideof the collector. Route the wire along the return pipe to the pump station avoiding direct contact withthe pipe.NOTICEDo not install the sensor wires in direct contact with system pipes. Route sensor wires onthe outside of system pipe insulation whenever possible.Step 2. Insert storage tank sensor (GRAY wire) into storage tank sensor well. Route the wire along thereturn pipe to the pump station avoiding direct contact with the pipe.Step 3. Remove the wire strain relief bar on sensor terminal side of controller.Step 4. Connect the red collector sensor wire to T1 terminals (red <strong>and</strong> white wires).Connect grey storage tank sensor to T2 terminals (brown <strong>and</strong> white wires).Step 5. Replace wire strain relief bar.d) Sensors wires can be fed through the pump station <strong>and</strong> out the top to run along the collector return pipeor out the bottom along the tank return pipe (OUTSIDE THE INSULATION).e) Once all wires are connected to the controller the cover can be replaced.Copyright 2011 – <strong>Apricus</strong> Inc Doc: A7-05.4.1.4-PB-1.9 Page 65 of 126

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!