12.07.2015 Views

inter roller fa final

inter roller fa final

inter roller fa final

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Operations ReviewBAGGAGE HANDLING SYSTEMSThe year 2004 is another record year for Inter-Roller. Inaddition to previously secured projects such as ChangiAirport Terminal 3 in Singapore, New BangkokInternational Airport in Thailand and Djerba-Zarzis inTunisia (North Africa), we also secured new orders forBaggage Handling System Projects in AhmedabadAirport in India as well as various projects in the MiddleEast. Repeat orders also came in from China includingHangzhou Xiaoshan Airport, Fuzhou Changle andChangsha Huanghua Airport.We ventured into new territory with the award of acontract to design and build a Baggage HandlingSystem for Curacao Hato International Airport in theCaribbean Islands. In the In-flight Catering business,we secured a project to supply a material handlingsystem to Emirates Airlines.Hong Kong International AirportSkyplaza ProjectHong KongIn January 2005, Inter-Roller secured a contract todesign and build a new Baggage Handling System atHong Kong International Airport’s Skyplaza Building.This is a new terminal designed to increase thecapacity of the existing Chek Lap Kok InternationalAirport in Hong Kong.The system includes 2 check-in islands, return tubsystem and high-speed conveyors in tunnelsconnecting to the existing passenger terminal building.The system is to <strong>inter</strong><strong>fa</strong>ce with the existingin town check-in system.A Management Information and Controls System(MICS) is also included as part of the supply. This MICSallows users to navigate on a graphical screen tomonitor status of the system.<strong>inter</strong>-<strong>roller</strong> engineering limited annual report2004 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!