2. installation procedure for optional equipment - toshiba tec europe
2. installation procedure for optional equipment - toshiba tec europe 2. installation procedure for optional equipment - toshiba tec europe
2. INSTALLATION PROCEDURE FOR OPTIONAL EQUIPMENT EO18-120102.2 Installing the LVDS PC Board and Back Indicator Unit10) Remove the two Hinge Holders from the Rear Cover.Rear CoverHinge Holder11) Secure the Back Indicator Unit onto the rear side of the POS terminal with the four screws.Back Indicator UnitDSM-4x12 ScrewDSM-4x12 Screw12) Insert the OPT Cable into the connector which is provided on the rear side of the POS terminal.OPT Cable2- 8
2. INSTALLATION PROCEDURE FOR OPTIONAL EQUIPMENT EO18-12010(Revision Date: Dec. 4, 2006)2.2 Installing the LVDS PC Board and Back Indicator Unit13) Lead the LVDS Cable as shown in the picture below, then insert this cable into the LVDS2 Connector on thefront side of the POS terminal.LVDS2 ConnectorLVDS Cable14) Reassemble in the reverse order of removal.NOTE:The dual display function is possible in a combination of 12-inch display and 15-inch display with theoption LVDS PC board, however, the resolution of the display is fixed as follows.12-inch display: SVGA (800 x 600 dots)15-inch display: XGA (1024 x 768 dots)After installing the second display, perform a BIOS setup. (Refer to Section 4.3.2 and Section 4.4.4.)2- 9
- Page 1 and 2: TEC POS TerminalST-71 SERIESMainten
- Page 3 and 4: EO18-12010(Revision Date: Jan. 30,
- Page 5 and 6: 1. UNPACKING EO18-120101.1 Procedur
- Page 7 and 8: 2. INSTALLATION PROCEDURE FOR OPTIO
- Page 9 and 10: 2. INSTALLATION PROCEDURE FOR OPTIO
- Page 11 and 12: 2. INSTALLATION PROCEDURE FOR OPTIO
- Page 13: 2. INSTALLATION PROCEDURE FOR OPTIO
- Page 17 and 18: 2. INSTALLATION PROCEDURE FOR OPTIO
- Page 19 and 20: 2. INSTALLATION PROCEDURE FOR OPTIO
- Page 21 and 22: 2. INSTALLATION PROCEDURE FOR OPTIO
- Page 23 and 24: 2. INSTALLATION PROCEDURE FOR OPTIO
<strong>2.</strong> INSTALLATION PROCEDURE FOR OPTIONAL EQUIPMENT EO18-12010<strong>2.</strong>2 Installing the LVDS PC Board and Back Indicator Unit10) Remove the two Hinge Holders from the Rear Cover.Rear CoverHinge Holder11) Secure the Back Indicator Unit onto the rear side of the POS terminal with the four screws.Back Indicator UnitDSM-4x12 ScrewDSM-4x12 Screw12) Insert the OPT Cable into the connector which is provided on the rear side of the POS terminal.OPT Cable2- 8