Grand Housing Development Program Volume III - Gtz
Grand Housing Development Program Volume III - Gtz Grand Housing Development Program Volume III - Gtz
DETAIL DRAWINGS FOR CONSTRUCTIONSection A-ASection B-BFloor planA4.0 cm2.0 cm2.5 cm 2.5 cm?0.8 cm2.0 cm0.2 cm12.5 cm0.2 cm10.0 cm4.4 cm4.4 cmB B?1.5 cm4.4 cmMounting saddle of a balcony’s posts in the detail drawing ...16.9 cmA10.0 cm4.0 cm4.0 cm10.0 cmDetailsscale 1:1BALCONY024A: 16.44 m2TILESH: 3.00 mR 1,31144 30 220 18 118 3 125 30TOILET026A: 8.50 m2MOZAICH: 3.12 m10 18 173 3 170 30 129 10 5SECRETARY025A: 11.06 m2MOZAICH: 3.12 m... and their locations in the first floor plan26 305 10 129 30 220 18 140 8020030 30 80200The preparation of detail drawings is crucial for easyand precise communication on the construction siteand also for producers of building parts.It is also necessary for the planner for checking thespacial and geometrical correctness of the construction.Dimensions, levels and heights can only be ensuredprecisely in sections and elevations.Different tolerances of the small, medium and largescale building parts and their analogous trades haveto be considered.The mounted saddles and post on the balconyDia 14mm REINFORCEMENT VERTICAL POSTDia 50mm CHS handrail50x30 RHS VERTICAL POST40x30 RHS VERTICAL POSTANCHORED TO HCB WALL Dia 50mm CHS HAND RAILDia 50mm CHS HORIZONTALRAILDia 50mm CHS HORIZONTALRAILDia 50mm CHS HORIZONTALRAILDia 50mm CHS HAND RAILDia 30mm CHS HORIZONTAL RAILDia 30mm CHS HORIZONTAL RAILDia 30mm CHS HORIZONTAL RAILThe posts after manufacturing.Exemplary detail drawing for a external staircase38Addis AbabaCity Government
DETAIL DRAWINGS FOR SANITARY INSTALLATION3-dimensional visualization of thetoilets’ and hand basins’ connectionsin ground floor and first floorPlanning the sanitaryinstallationMaking a freehand sketch of thelavatory and it’s sanitary furnituregives a basic idea of the futurelocations of the furniture. Partitionwalls as well as the height of tilingand it’s layout are considered.Proper sloping of the wastewaterpipes in mind, the locations andthe dimensions of pipes are specified.For installations that passno solid wastes into the systema diameter of 55 mm is normallysufficient. For others, like toilets,a diameter of 110 mm is needed.Connectors and reducers have tobe chosen and properly specified.Fall pipes have to be plannedstraight and unbroken through allstoreys. They should have a ventilationopening at the upper endand have to extend up to the roof.Proper ventilation of the fall pipesand the house drain is importantto prevent the siphon traps formemptying when flushing toilets.The first sketch of the sanitary installation in the ground floor toiletThe connection of the pipes to thehouse drain should be rounded toprevent clogging.Sanitary designs have to be doneor approved by an engineer.The final detail drawing with all necessary measurements and technical descriptionsTHE KASANCHIS RENOVATION PROJECT HINTS ON THE PLANNING PHASE39Addis AbabaCity Government
- Page 5 and 6: Prologue 3Contents 5Design basics a
- Page 7 and 8: BUILDING PARTSFull HCBThe full holl
- Page 9 and 10: BUILDING PARTS4 U-shaped HCBs joine
- Page 11 and 12: SCHEMATIC CONSTRUCTION PROCESS5 6Re
- Page 13 and 14: SCHEMATIC CONSTRUCTION PROCESS13 14
- Page 15 and 16: MORTAR AND MASONRY WORK CONSIDERATI
- Page 17 and 18: VIBRATING TABLEDrawings of the vibr
- Page 19 and 20: CLAMPS FOR HOLDING PARTS OF FORMWOR
- Page 21 and 22: THE MANHOLEBottom-view (left) and t
- Page 23 and 24: CONSTRUCTION GUIDELINE STEP BY STEP
- Page 25 and 26: CONSTRUCTION GUIDELINE STEP BY STEP
- Page 27 and 28: CONSTRUCTION GUIDELINE STEP BY STEP
- Page 29 and 30: CONSTRUCTION GUIDELINE STEP BY STEP
- Page 31 and 32: BASICS ON ECOLOGICAL SANITATION- Op
- Page 33 and 34: FUNCTIONAL DESCRIPTION OF A DRY TOI
- Page 35 and 36: ECOSAN PILOT PROJECT (PPP)The priva
- Page 37: 8189 126Sections wash basin22fae
- Page 41 and 42: SANITARY INSTALLATIONTo ensure corr
- Page 43 and 44: WALL CONSTRUCTIONExisting exterior
- Page 45 and 46: FIRST FLOOR SLAB REPAIRA lintel is
- Page 47 and 48: CONCRETE BEAM REPAIRInserting the n
- Page 49 and 50: ROOF COVERINGRoofing shingle made o
- Page 51 and 52: INTERNAL STAIRCASEThe handrail befo
- Page 53 and 54: PLASTER WORKApplying fist coat (spl
- Page 55 and 56: FIRST FLOOR TERRACES WEATHERPROOFIN
- Page 57 and 58: FLOORING WITH CEMENT OXIDE SCREEDCa
- Page 59 and 60: LAYING THE PARQUETFor some rooms,fo
- Page 61 and 62: TILING WORKTiles can be cut with an
- Page 63 and 64: SUSPENDED CEILINGSLathing for the s
- Page 65 and 66: RENEWAL OF DOORS & WINDOWSChecking
- Page 67 and 68: PAVING WORKKeep similar sizesof rab
- Page 69 and 70: ANALYSIS OF PRECAST BEAMThe analysi
- Page 71 and 72: ANALYSIS OF BEAM AND COLUMNThe dept
- Page 73 and 74: ANALYSIS OF BEAM AND COLUMNCOLUMNSw
- Page 75 and 76: TYPICAL 3D MODELS OF RESIDENTIAL AN
- Page 77 and 78: TYPICAL 3D MODELS OF RESIDENTIAL AN
- Page 79 and 80: STRUCTURAL DESIGN OF COST EFFICIENT
- Page 81 and 82: STRUCTURAL DESIGN OF COST EFFICIENT
- Page 83 and 84: STRUCTURAL DESIGN OF COST EFFICIENT
- Page 85 and 86: STRUCTURAL DESIGN OF COST EFFICIENT
- Page 87: CREDITS TO THE STAKEHOLDERSTsedale
DETAIL DRAWINGS FOR SANITARY INSTALLATION3-dimensional visualization of thetoilets’ and hand basins’ connectionsin ground floor and first floorPlanning the sanitaryinstallationMaking a freehand sketch of thelavatory and it’s sanitary furnituregives a basic idea of the futurelocations of the furniture. Partitionwalls as well as the height of tilingand it’s layout are considered.Proper sloping of the wastewaterpipes in mind, the locations andthe dimensions of pipes are specified.For installations that passno solid wastes into the systema diameter of 55 mm is normallysufficient. For others, like toilets,a diameter of 110 mm is needed.Connectors and reducers have tobe chosen and properly specified.Fall pipes have to be plannedstraight and unbroken through allstoreys. They should have a ventilationopening at the upper endand have to extend up to the roof.Proper ventilation of the fall pipesand the house drain is importantto prevent the siphon traps formemptying when flushing toilets.The first sketch of the sanitary installation in the ground floor toiletThe connection of the pipes to thehouse drain should be rounded toprevent clogging.Sanitary designs have to be doneor approved by an engineer.The final detail drawing with all necessary measurements and technical descriptionsTHE KASANCHIS RENOVATION PROJECT HINTS ON THE PLANNING PHASE39Addis AbabaCity Government