SCHEMATIC CONSTRUCTION PROCESS13 14When all slab-HCBs are placed, the result will be also a Concrete filling is done on top of beams and slabformworkfor the concrete-filling of the future slab. HCBs. The quality has to be at least C25.A temperature reinforcement is to be laid on top of theHCBs with properly bent hooks at the ends of the reinforcementbars. The diameter of the reinforcementbars is 6 mm .Formwork panels are placed at the outer edges of ringbeamsto complete the formwork.15 16(CONTINUED)These drawings are schematic drawings of the final construction. A part of the slab’s concrete filling is cut away toillustrate the position of reinforcement and slab-HCBs within the concrete filling.FROM TECHNICAL MANUALS VOL I AND II SCHEMATIC CONSTRUCTION PROCESS13Addis AbabaCity Government