Derry, Michener, Booth & Wahl Consultants Ltd. Page 41As shown in table 14.7 (appendix), all samples passed QA QC satisfactorily. A graph of theseresults is shown in Figure 14.4.14.8 Twinned HolesUpon the recommendations of DMBW, the program was started in December and to year endvertical RC hole PL07-RC 20 had been twinned by vertical core hole 08LCDD-10, with thefollowing resultsTable 14.8 Twinned hole PL07 RC-20RC20Au DD10Auchips From To Metres ppm core From To Metres ppm20.4 79.9 59.5 1.92 30.6 94.0 63.4 1.51GT 20 114.2 GT10 95.787.5 172.8 85.3 1.37 102.0 185.0 83.0 1.98GT20 116.8 GT 10 164.3<strong>The</strong> cored hole was offset about 5 m and the intersections are about 10 m deeper, however theaverage grade-thickness products in the lower intercept are too variable.A total of 5 more RC holes were twinned in 2008 by core holes; assays are not available for thedata base but the geology and mineralization have been used to verify zone continuity.When this data is available a more informed opinion can be made. (See Section 17)14.9 Conclusion<strong>The</strong> data verification measures observed by DMBW meet industry norms and there are no factorsthat would limit the use of such data.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!