Digesters - Metropolitan Water Reclamation District of Greater Chicago
Digesters - Metropolitan Water Reclamation District of Greater Chicago Digesters - Metropolitan Water Reclamation District of Greater Chicago
Project Contributors• Tom Kunetz, MWRD• Ed Brosius, MWRD• Paul O’Brien, MWRD• Jarek Fink-Finowicki, MWRD• Eric Auerbach, Malcolm Pirnie/Arcadis• Tom Lachcik, Malcolm Pirnie/Arcadis• Eric Wang, Malcolm Pirnie/Arcadis• Krishna Pagilla, MPR• Arun Mande, MPR• Cathy Busking, Busking Engineering
Presentation Outline• Background/Purpose• Digester Gas Production at SWRP• Energy Consumption at SWRP• Selection of Gas Utilization Alternatives• Energy Flow Modeling• Evaluation of Results and System Selection
- Page 1: Digester Gas Utilization at SWRPWhe
- Page 9 and 10: Projected Digester PerformanceVSR
- Page 12 and 13: Digester Gas Production - Modeling
- Page 15 and 16: Energy Consumption at SWRP• Build
- Page 24 and 25: Energy Flow Scenarios:Digester Gas?
- Page 26 and 27: Energy Flow Modeling Framework26
- Page 28 and 29: Model Components - Gas Cleanings H2
- Page 30 and 31: Model Components - Plant Energy Dem
- Page 32 and 33: Projecting Future Energy Prices•
- Page 34 and 35: Energy Flow Model - ScenariosScenar
- Page 36 and 37: Energy Flow Model - Results$2,000,0
- Page 38 and 39: Engine Operation Alternatives• Ba
- Page 40 and 41: Updated Model Parameters• New Per
- Page 42: Sensitivity Analysis - Electricity
- Page 45 and 46: Triple Bottom Line Analysis• Econ
- Page 47 and 48: Other Reference InstallationsMetrop
- Page 49 and 50: Calls and Field Visits - Steam Turb
- Page 51 and 52: Conclusions/Discussion• A Combine
Presentation Outline• Background/Purpose• Digester Gas Production at SWRP• Energy Consumption at SWRP• Selection <strong>of</strong> Gas Utilization Alternatives• Energy Flow Modeling• Evaluation <strong>of</strong> Results and System Selection