12.07.2015 Views

Current Catalog - John S. Hyatt & Associates, Inc.

Current Catalog - John S. Hyatt & Associates, Inc.

Current Catalog - John S. Hyatt & Associates, Inc.

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

JAMESPRE-RIG TRUSSENGINEERINGPre-Rig truss is 30" x 26" in size. It is manufactured from aluminium tube 6082-T6 with 2" x .125"wall thickness for main tubes and 1" x .125" wall tube for the diagonals. Each truss piece has 4 castorwheels for easy maneuverability and bolts for the connection of truss pieces.Each truss is designed to carry 2 lighting bars complete with lanterns. The lighting bars are storedinternally in the truss and can be lowered to the working position when in use. This design reduces theamount of space required for lighting and rigging in the truck. Each truss is also designed to carry avarying amount of lanterns, the 10' section carries 2 bars of 8 lanterns, 7' 7"section carries 2 bars of 6lanterns, 5' section carries 2 bars of 4 lanterns, and the 3' 9-1/2" section carries 2 bars of 3 lanterns. Thisfeature enables great flexibility in the truss design.The Pre-Rig truss accepts a modified lighting bar which have 2 sleeved holes in them. The lightingbars are located inside the truss by guide rods. In the storage position the bars are securely held in thetruss by shank hooks. The whole system can be used with our Ground Support System by using suitablesleeve blocks and towers.PRODUCTCODEB0300B0301B0302B0303B0304B4300B4301B4302B4303B4304B4305B4306DESCRIPTION10' section (empty)7' 7" section (empty)5' section (empty)3' 9 1/2" section (empty)6"-12" make up piece (empty)2 way corner block4 way corner blockUniversal pivot section0-270 degreeUniversal pivot section0-90 degreeHorizontal load-bearing pivotsectionVertical load-bearing pivotsectionP.R.T. to G.P. adapterWTlbs111.39177.1557.35-52.961.7559.559.5123.5123.528.65Par 64 lanterns in storage positionPar 64 lanterns lowered to operating positionTo lower lanterns from storage tooperating position, simply pull tab onshank hook with one hand whilstholding the lighting bar with the otherhand. Then lower the lanterns intooperating position.C12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!