Manual HAHSON SR8 PLUS - VTP UP
Manual HAHSON SR8 PLUS - VTP UP
Manual HAHSON SR8 PLUS - VTP UP
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>SR8</strong>-Plus Operation <strong>Manual</strong>73-100-810-I9 Moving and Storage9.1 StorageIf the <strong>SR8</strong>-Plus Dissolution Test Station will not be used for an extended period of time (3months or more) the power should be turned off and the bath water should be emptied.9.2 MovingBefore moving the <strong>SR8</strong>-Plus Dissolution Test Station, it is necessary to empty the water fromthe waterbath. If the <strong>SR8</strong>-Plus is being relocated within the same laboratory or building, thesystem can be moved without any additional packing procedures. If the system is beingtransported to another location, the locking screws and clamps (removed in Section 4 of thismanual) should be replaced. The locking screws and clamps keep the counterweights anddrive head from moving. If the packing materials that the system was shipped in were saved,the system should be repackaged to avoid damage in shipment.Section 9 Moving and Storage – 64 –