12.07.2015 Views

Manual HAHSON SR8 PLUS - VTP UP

Manual HAHSON SR8 PLUS - VTP UP

Manual HAHSON SR8 PLUS - VTP UP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>SR8</strong>-Plus Operation <strong>Manual</strong>73-100-810-I4.12 Connecting the E-ProbeNOTE: The E-Probe power cord is the smaller of the two power cords supplied. Do notswitch these two power cords; always use the heavier, main power cord for control.1. Connect the power supply (black rectangular box, with plug) into the round connectorcoming out with tubing and the other connectors on the right side of the <strong>SR8</strong>-Plus.2. Loop cable around and clamp with cable tie. The power supply may become unpluggedif this is not done.3. Connect the power cord into the side of the power supply. Connect the other end of thepower cord into a grounded outlet.4.13 Adjusting Sample ProbesThe tip of the sampling probe should be midway between the top of the media and the top ofthe paddle or basket.To adjust E-Probe sampling probes:1. Make sure probe is at the top of the stroke. If you are not sure, home probes. (seeSection 5.17--System Configuration Parameters: E-Probe Setup)2. Have the <strong>SR8</strong>-Plus mechanical settings adjusted and ready to start the test.3. Select the Protocol to run and with the “Drop Dose and Press Run” window shown,press the down arrow to lower the probe by the stroke amount for that protocol.4. Loosen the thumb-screw on the upper coupler and slide the sampling tube up or down toachieve the correct sampling position and tighten the thumb-screw to lock the samplingprobe in place.Section 4 Installation – 22 –

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!