12.07.2015 Views

Manual HAHSON SR8 PLUS - VTP UP

Manual HAHSON SR8 PLUS - VTP UP

Manual HAHSON SR8 PLUS - VTP UP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>SR8</strong>-Plus Operation <strong>Manual</strong>73-100-810-IFigure 4-12: Circulating Water Pump Connection12. Install the temperature probes(s). (see Figure 4-13)NOTE: The system is designed to operate with either one or two temperature probes. One issupplied with the system, the other is optional. Probe 1 is designed to be placed inthe bath. Probe 2 can be placed in Vessel 7 or 8 if they are not used for testing, or atthe opposite end of the bath.a) Plug the temperature probe(s) into the connector(s) labeled “TEMP PROBES” onthe left hand side of the <strong>SR8</strong>-Plus Controller. The first probe must be plugged intoconnector “1”, and the optional second probe must be plugged into connector “2”.b) For Probe 1, route the cable around the side of the bath and place the temperatureprobe into the bath, using one of the two holes indicated in Figure 13. Push thetemperature probe into the bath as far as it will go.c) For Probe 2, route the cable behind the bath and place the temperature probe intoeither Vessel 7 or 8. Secure the probe so that it remains in the vessel.Section 4 Installation – 17 –

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!