Manual HAHSON SR8 PLUS - VTP UP
Manual HAHSON SR8 PLUS - VTP UP
Manual HAHSON SR8 PLUS - VTP UP
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>SR8</strong>-Plus Operation <strong>Manual</strong>73-100-810-IFigure 4-8: Leveling4.7 Bath Installation1. Position the bath support on the lab bench so that it is touching the back of the <strong>SR8</strong>-Plusframe and is centered left to right. The open gap should be towards the front. (seeFigure 4-9)Figure 4-9: Positioning the Bath Support2. With the heater toward the back, slide in the bath on top of the bath support. (seeFigure 4-10)Section 4 Installation – 14 –