12.07.2015 Views

Installation and Commissioning

Installation and Commissioning

Installation and Commissioning

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Technical specification3.6 Automatic OperationThe following production window comm<strong>and</strong>s are available:- Load/select the program.- Start the program.- Execute instruction-by-instruction (forward/backward).- Reduce the velocity temporarily.- Display program-controlled comments (which tell the operator what ishappening).- Displace a position, also during program execution (can be blocked).3.7 Maintenance <strong>and</strong> TroubleshootingThe following maintenance is required:- Lubricating spring brackets every six months.- Changing filter for the transformer/drive unit cooling every year.- Greasing axes 5 <strong>and</strong> 6 every year.- Changing batteries every third year.The maintenance intervals depends on the use of the robot. For detailed information onmaintenance procedures, see Maintenance section in the Product Manual.32 Product Specification IRB 1400 M98/BaseWare OS 3.1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!