12.07.2015 Views

Installation and Commissioning

Installation and Commissioning

Installation and Commissioning

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The Wrist <strong>and</strong> Axes 5 <strong>and</strong> 6Repairs7.2 Dismantling the complete drive mechanism of axes 5 <strong>and</strong> 6See foldouts 8 <strong>and</strong> 9 in the list of spare parts.To dismantle:1. Dismantle the wrist as in section 7.1.2. Loosen the connectors on the motors of axes 5 <strong>and</strong> 6.3. Undo screws .4. Squeeze the drive shafts () together at the tip of the tubular shaft, in order thatthey can pass through the tube.5. Pull out the complete drive mechanism of axes 5 <strong>and</strong> 6.To assemble:6. Install the drive mechanism in the tubular shaft.7. Tighten screws to a torque of 8.3 Nm ±10%.8. Insert the cabling.9. Mount the wrist as in section 7.1.Tightening torque:Screwed joint of the drive mechanism, item : 8.3 Nm ±10%7.3 Changing the motor or driving belt of axes 5 <strong>and</strong> 6See foldout 9 in the list of spare parts.To dismantle:1. Dismantle the wrist as in section 7.1.2. Dismantle the drive mechanism as in 7.2.3. Undo screws <strong>and</strong> remove the appropriate motor.4. If the driving belt is to be changed, both motors must be removed.5. Undo screws <strong>and</strong> remove plate .34 Product Manual IRB 1400

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!