12.07.2015 Views

Installation and Commissioning

Installation and Commissioning

Installation and Commissioning

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Cabling <strong>and</strong> Serial Measuring boardRepairs6.3 Changing the cabling in axes 4, 5 <strong>and</strong> 6See foldouts 2, 3 <strong>and</strong> 4 (6 for IRB 1400H) in the list of spare parts.To dismantle:1. Remove the cover of the motors.2. Remove the flange plate .3. Loosen connectors R2.MP4-6 <strong>and</strong> R2.FB4-6, including customer connectorR1.CS (if there is one) <strong>and</strong> the air hose.4. Detach the cable guides .5. Loosen the cable brackets between gears 2 <strong>and</strong> 3 <strong>and</strong> cut the tie aroundthem.6. Feed the cabling <strong>and</strong> air hose up through axis 1.7. Loosen the cable bracket on the lower arm <strong>and</strong> undo screws .8. Undo screw which fixes the shaft of the tie rod.9. Disconnect the connection boxes in the motors.10. Loosen the remaining cable brackets <strong>and</strong> remove the cabling.To assemble:11. Assemble in the reverse order.32 Product Manual IRB 1400

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!