Installation and Commissioning
Installation and Commissioning Installation and Commissioning
Repairs Axis 45.4 Dismantling the tubular shaft and changing bearingsSee foldout 8 in the list of spare parts.To dismantle:1. Dismantle the drive gear as in Chapter 5.3, Dismantling the drive gear on the tubularshaft.2. Push out the tubular shaft.To assemble:3. Fit a new bearing on the tubular shaft using tool 6896 134-V.4. Push the tube into the housing of the upper arm.5. Insert the rear bearing using tool 6896 134-JB.6. Mount the drive gear as in Chapter 5.3, Dismantling the drive gear on the tubularshaft.7. Calibrate the robot as in Chapter 9, Calibration.Tools:Pressing tool for front bearing: 6896 134-VPressing tool for rear bearing:6896 134-JBProduct Manual IRB 1400 29
Axis 4 Repairs30 Product Manual IRB 1400
- Page 331 and 332: Troubleshooting Tools3.2 Signal des
- Page 333 and 334: Troubleshooting Tools3.3 X1 and X2
- Page 335 and 336: Troubleshooting Tools3.4.2 X9 VBATT
- Page 337 and 338: Troubleshooting Tools3.4.5 Disk dri
- Page 339 and 340: Troubleshooting Tools3.4.7 CANX9Pin
- Page 341 and 342: Fault tracing guideCONTENTSPage1 Fa
- Page 343 and 344: Fault tracing guide1 Fault tracing
- Page 345 and 346: Fault tracing guide1.4 Robot comput
- Page 347 and 348: Fault tracing guideInputs DINameAS1
- Page 349 and 350: Fault tracing guide1.7 Serial Commu
- Page 351 and 352: Fault tracing guide1.11 Disk DriveT
- Page 353 and 354: ABB Flexible Automation ABThis chap
- Page 355 and 356: RepairsCONTENTSPage7.3 Changing the
- Page 357 and 358: General DescriptionRepairsAxis 1 ro
- Page 359 and 360: General DescriptionRepairs1.2 Cauti
- Page 361 and 362: General DescriptionRepairs12. The s
- Page 363 and 364: General DescriptionRepairs1.5 Tight
- Page 365 and 366: Axis 1Repairs2.2 Changing the gearb
- Page 367 and 368: Axis 1Repairs2.4 Replacing the mech
- Page 369 and 370: Axis 2 Repairs3.2 Changing the gear
- Page 371 and 372: Axis 2 Repairs3.5 Dismantling the b
- Page 373 and 374: Axis 3Repairs4.2 Changing the gearb
- Page 375 and 376: Axis 3Repairs4.5 Dismantling the co
- Page 377 and 378: Axis 3Repairs105 oFigure 4 Calibrai
- Page 379 and 380: Axis 4 Repairs14. Connect the cabli
- Page 381: Axis 4 RepairsTo assemble:Shim betw
- Page 385 and 386: Cabling and Serial Measuring boardR
- Page 387 and 388: The Wrist and Axes 5 and 6Repairs7.
- Page 389 and 390: The Wrist and Axes 5 and 6RepairsAx
- Page 391 and 392: Motor UnitsRepairs38 Product Manual
- Page 393 and 394: CalibrationRepairs5. Press Enter .6
- Page 395 and 396: CalibrationRepairs13. Release the b
- Page 397 and 398: CalibrationRepairsCalibration plate
- Page 399 and 400: CalibrationRepairs2. Select Service
- Page 401 and 402: CalibrationRepairs.Figure 17 Calibr
- Page 403 and 404: CalibrationRepairs1. Run the calibr
- Page 405 and 406: CalibrationRepairs52 Product Manual
Axis 4 Repairs30 Product Manual IRB 1400