12.07.2015 Views

Installation and Commissioning

Installation and Commissioning

Installation and Commissioning

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Repairs Axis 3Figure 3 Measuring the shim thickness when preloading the bearing.16. Make a note of the dimension “A”. Fit one washer <strong>and</strong> shims <strong>and</strong>,using the micrometer, measure the thickness so that the total thickness is 0.10 -0.20 mm more than the noted dimension “A”. This will result in a preloading ofthe bearing of 0.10 - 0.20 mm.17. Fit the shims <strong>and</strong> washer <strong>and</strong> tighten the KM nut .18. Replace the upper attachment of the tie rod as in Chapter 4.4, Changing the tie rod.19. Replace the equalizer springs as in Chapter 3.5, Dismantling the balancing springs(not valid for IRB 1400H).20. Reconnect the connection boxes <strong>and</strong> the cabling.21. Calibrate the robot as in Chapter 9, Calibration.22. Undo the KM-nut on the axis 2 side, just to be able to adjust the calibration washer.23. If the old armhouse is mounted, adjust the calibration washer according to thepunch mark. If the armhouse is new adjust the washer according to Figure 4 <strong>and</strong>make a new punch marks for axes 3 <strong>and</strong> 4, according to chapter 9.2.Product Manual IRB 1400 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!