12.07.2015 Views

Installation and Commissioning

Installation and Commissioning

Installation and Commissioning

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Axis 3Repairs4.5 Dismantling the complete upper armSee foldout 2 in the list of spare parts.To dismantle:Attach a crane to the upper arm.1. Unscrew the upper bracket of the tie rod as in Chapter 4.4, Changing the tie rod.2. Loosen the connectors of the motors of axes 4, 5 <strong>and</strong> 6.3. Disconnect the connection box from the motors.4. Detach the equalizer springs as in Chapter 3.5, Dismantling the balancing springs(not valid for IRB 1400H).5. Undo the KM nuts .6. Remove washers <strong>and</strong> shims on the same side as axis 3.7. Attach the withdrawing tool 3HAB 1259-1 <strong>and</strong> pull the axes off.To assemble:8. Raise the upper arm into assembly position.9. Install shaft spindles (both sides), use two temporary screws M10x90.10. Insert bearings (both sides) using tool 3HAB 1200-1 <strong>and</strong> screws .11. Detach the tool <strong>and</strong> tighten the screws once more, only to prevent rotation of theaxis when the KM nut is tightened.N.B. Assemble the same side as axis 2 first.12. Mount two washers <strong>and</strong> calibration washer .13. Tighten using the KM nut .14. Attach the measuring instrument 3HAB 1205-1 to the shaft spindle on axis 3.N.B. If measuring instrument 3HAB 1205-1 is not available, you can use amicrometer thickness gauge.15. Hold the tool against the shoulder of the shaft spindle <strong>and</strong> measure thedimension “A”. See Figure 3.(If you are not using the measuring instrument, tighten using the KM nut <strong>and</strong>,before measuring with the micrometer thickness gauge, then undo it again.)22 Product Manual IRB 1400

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!