12.07.2015 Views

Installation and Commissioning

Installation and Commissioning

Installation and Commissioning

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Repairs Axis 34.4 Changing the tie rodSee foldout 2 in the list of spare parts.To dismantle:Lock the upper arm in a horizontal position with the help of a crane or similar.1. Unscrew screw .2. Undo the two screws for fixing the cabling bracket of the upper arm housing.Fold back the cabling bracket.3. Screw the screw back into the shaft .4. Carefully knock the shaft out.5. Remove housing .6. Unscrew on the lower bracket.7. Carefully tap the rod off the shaft.8. Change the bearings.To assemble:9. Fit bearings on the parallel arm.10. Make sure you replace the rod the correct way up. See foldout 1 (1:1).11. Install grommets: (3 x) <strong>and</strong> (1 x) .Note: grommet is bevelled <strong>and</strong> must be inserted the right way up in thelower bearing.12. Place the lower bearing of the tie rod on the parallel arm.13. Screw in screw <strong>and</strong> its washer . Lock using Loctite 242 or 243.14. Replace shaft . N.B. Do not forget the sleeve .15. Mount washer <strong>and</strong> tighten the shaft using a temporary screw, M8x35.16. Replace this screw by screw <strong>and</strong> mount the cable bearer .Lock using Loctite 242 or 243.Product Manual IRB 1400 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!