12.07.2015 Views

Installation and Commissioning

Installation and Commissioning

Installation and Commissioning

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Troubleshooting Tools3.4.7 CANX9Pin A C25 CANRLY2 N CANRLY3 N26 CAN_H CAN_LCANRLY2 N <strong>and</strong> CANRLY3 N respectively:0V when CAN 2 or CAN 3 is active (see <strong>Installation</strong> <strong>and</strong> <strong>Commissioning</strong>, section3.17.3).24V when CAN 2 <strong>and</strong> CAN 3 are disconnected (see <strong>Installation</strong> <strong>and</strong> <strong>Commissioning</strong>,section 3.17.3). In this case the backplane fixed termination resistor is connected in.3.4.8 SafetyX9Pin A C27 ENABLE9 SPEEDENABLE 9:5V when supply voltage is OK <strong>and</strong> the computers are OK (output from the robot computerto the panel unit; LED EN).SPEED:5V when one of the modes AUTO or MANUAL FULL SPEED is active (input to therobot computer from the panel unit).Product Manual 39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!