12.07.2015 Views

Installation and Commissioning

Installation and Commissioning

Installation and Commissioning

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Troubleshooting ToolsModule- <strong>and</strong> network status LEDs at power-upThe system performs a test of the MS <strong>and</strong> NS LEDs during start-up. The purpose of this testis to check that all LEDs are functioning properly. The test runs as follows:- - NS LED is switched Off.- - MS LED is switched On green for approx. 0.25 seconds.- - MS LED is switched On red for approx. 0.25 seconds.- - MS LED is switched On green.- - NS LED is switched On green for approx. 0.25 seconds.- - NS LED is switched On red for approx. 0.25 seconds.- - NS LED is switched On red.If a device has other LEDs, each LED is tested in sequence.CAN Tx - CAN network transmitDescriptionGreen LED. Physically connected to theCan Tx line. Flashes when the CPU isreceiving data on the CAN bus.Remedy / Source of faultIf no light when transmission is expected,check error messages.Check system boards in rack.CAN Rx - CAN network receiveDescriptionGreen LED. Physically connected to theCan Rx line. Flashes when the CPU istransmitting data on the Can bus.Remedy / Source of faultIf no light, check network <strong>and</strong>connections.Product Manual 29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!