Troubleshooting ToolsX1X3X5X2AC OK24 V I/O X7OnlyDSQC 365Designation Colour Description/RemedyAC OK Green 3 x 55V supply OK(start of ENABLE chain)24 V I/O Green 24 V I/O OK18 Product Manual

Troubleshooting Tools2.7 Panel unit DSQC 331WARNING!REMOVE JUMPERS BEFORE CONNECTINGANY EXTERNAL EQUIPMENTStatus LED’sENMSNSES1ES2 GS1 GS2 AS1 AS2Designation Colour Description/RemedyEN Green Enable signal from power supplyand computersMS/NS Green/red See section 2.14.ES1 and 2 Yellow Emergency stop chain 1 and 2 closedGS1 and 2 Yellow General stop switch chain 1 and 2 closedAS1 and 2 Yellow Auto stop switch chain 1 and 2 closedProduct Manual 19

Troubleshooting ToolsX1X3X5X2AC OK24 V I/O X7OnlyDSQC 365Designation Colour Description/RemedyAC OK Green 3 x 55V supply OK(start of ENABLE chain)24 V I/O Green 24 V I/O OK18 Product Manual

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!