12.07.2015 Views

Installation and Commissioning

Installation and Commissioning

Installation and Commissioning

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Troubleshooting Tools7. UART1. T9800 Up one level2. T1029 IOC SIO2 RS422 loopback test3. T1013 IOC TPUNIT RS422 loopback test4. T1033 IOC SIO2 RS422 JUMPER test (requires special hardware jumpers)5. T1022 IOC TPUNIT RS422 JUMPER test (Requires special hardware jumpers<strong>and</strong> must be run from terminal)8. DMA (Not yet implemented)9. VME (Not yet implemented)10. Miscellaneous1. Up one level2. T1018 IOC Battery test startup3. T1060 IOC System Reset11. LED1. Up one level2. T1503 IOC LED on3. T1504 IOC LED off4. T1518 IOC CAN LEDs sequence test5. DSQC 3xx (AXC)1. Up one level2. AXC CPU (Not yet implemented)3. RWM1. T9800 Up one level2. T1067 IOC IOC->AXC Memory test (RWM)3. T1068 IOC IOC->AXC Memory test (RWM) R6 Global4. T1069 IOC IOC->AXC Memory test (RWM) DSP5. T3001 AXC RWM test Dstr6. T3002 AXC R6 Global RWM test7. T3003 AXC DSP Double access RWM test8. T3004 AXC DSP Data RWM test4. VME1. Up one level2. T1053 IOC IOC->AXC Access test3. T1062 IOC IOC->AXC AM test4. T3020 AXC VME interrupt test10 Product Manual

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!