12.07.2015 Views

Installation and Commissioning

Installation and Commissioning

Installation and Commissioning

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Installation</strong> <strong>and</strong> <strong>Commissioning</strong>External AxesMEASUREMENT SYSTEM 1 (only external axes, no robot)configuration files ACxM1D1(Measurement System 2 may not be usedtogether with this configuration)CPUSerialMeasurementBoard 1SerialMeasurementBoard 2MeasurementSystem 1serialcommunicationMax 6resolversFigure 58 Measurement system 1.ResolverEach resolver contains two stators <strong>and</strong> one rotor, connected as shown in Figure 59.EXC*0v EXC** See connectiontableX*0V X*Stator XRotorStator YY*0V Y*Figure 59 Connections for resolvers.Technical dataResolverMotor to resolver gear ratioIntegrated in motor of IRB typeorart.no. 5766 388-5, size 11Resolver must be approved by ABBfor reliable operation.1:1, direct driveResolver cable length:max 30 m (X, Y for each resolver)total max 70 m for EXC signals.Product Manual IRB 1400 97

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!