Installation and Commissioning
Installation and Commissioning Installation and Commissioning
Connecting SignalsInstallation and CommissioningThe Profibus-DP system can communicate with a number of external devices. Theactual number depends on the number of process words occupied of each unit. Therobot can be equipped with one or two DSQC352. The Profibus-DP inputs and outputsare accessible in the robot as general inputs and outputs.For application data, refer to Profibus-DP, International Standard, DIN 19245 Part 3.*1 - Note that the Profibus cable must be terminated in both ends.X20Profibus-DP Signal name Pin DescriptionShield 1 Cable screen591 6NC 2 Not connectedRxD/TxD-P 3 Receive/Transmit data PControl-P 4GND 5 Ground connection+ 5V DC 6NC 7 Not connectedRxd/TxD-N 8 Recieve/Transmit data NNC 9 Not connectedX3Profibus-DP supply Signal name Pin Description510 V DC 1 External supply of Profibus-DPNC 2 Not connectedGND 3 Ground connectionNC 4 Not connected+ 24 V DC 5 External supply of Profibus-DPDevice Net connector X5, see section 3.16.3 on page 51.78 Product Manual IRB 1400
Installation and CommissioningConnecting Signals3.18 Communication3.18.1 Serial links, SIOThe robot has two serial channels, which can be used by the customer to communicatewith printers, terminals, computers and other equipment (see Figure 51).The serial channels are:- SIO1-RS 232 with RTS-CTS-control and support for XON/XOFF,transmission speed 300 - 19 200 baud.- SIO2-RS 422 full duplex TXD4, TXD4-N, RXD4, RXD4-N,transmission speed 300 - 19 200 baud.Further informationFor setup parameters, see User’s Guide, section System Parameters, Topic: Controller.Circuit diagram, see chapter 11.Product Specification IRB 1400, chapter 3.10.Separate documention is included.when the option RAP Seriel link is ordered.External computerFigure 51 Serial channels, SLIP, outline diagram.Customer terminals, on controller backplane:X1(SIO1) and X2(SIO2), see 3.7.Two variants exits depending on backplane type.Cable connectors with screwed connections (not supplied), type Phönix CombiconMSTTBVA 2.5/12-6-5.08. Keying of board connector according to circuit diagram,chapter 11.Product Manual IRB 1400 79
- Page 209 and 210: Installation and CommissioningOn-Si
- Page 211 and 212: Installation and CommissioningOn-Si
- Page 213 and 214: Installation and CommissioningConne
- Page 215 and 216: Installation and CommissioningConne
- Page 217 and 218: Installation and CommissioningConne
- Page 219 and 220: Installation and CommissioningConne
- Page 221 and 222: Installation and CommissioningConne
- Page 223 and 224: Installation and CommissioningConne
- Page 225 and 226: Installation and CommissioningConne
- Page 227 and 228: Installation and CommissioningConne
- Page 229 and 230: Installation and CommissioningConne
- Page 231 and 232: Installation and CommissioningConne
- Page 233 and 234: Installation and CommissioningConne
- Page 235 and 236: Installation and CommissioningConne
- Page 237 and 238: Installation and CommissioningConne
- Page 239 and 240: Installation and CommissioningConne
- Page 241 and 242: Installation and CommissioningConne
- Page 243 and 244: Installation and CommissioningConne
- Page 245 and 246: Installation and CommissioningConne
- Page 247 and 248: Installation and CommissioningConne
- Page 249 and 250: Installation and CommissioningConne
- Page 251 and 252: Installation and CommissioningConne
- Page 253 and 254: Installation and CommissioningConne
- Page 255 and 256: Installation and CommissioningConne
- Page 257 and 258: Installation and CommissioningConne
- Page 259: Installation and CommissioningConne
- Page 263 and 264: Installation and CommissioningConne
- Page 265 and 266: Installation and CommissioningConne
- Page 267 and 268: Installation and CommissioningInsta
- Page 269 and 270: Installation and CommissioningInsta
- Page 271 and 272: Installation and CommissioningInsta
- Page 273 and 274: Installation and CommissioningExter
- Page 275 and 276: Installation and CommissioningExter
- Page 277 and 278: Installation and CommissioningExter
- Page 279 and 280: Installation and CommissioningExter
- Page 281 and 282: Installation and CommissioningExter
- Page 283 and 284: Installation and CommissioningExter
- Page 285 and 286: Installation and CommissioningExter
- Page 287 and 288: Installation and CommissioningExter
- Page 289 and 290: Installation and CommissioningExter
- Page 291 and 292: Installation and CommissioningExter
- Page 293 and 294: MaintenanceCONTENTSPage1 Maintenanc
- Page 295 and 296: MaintenanceMaintenanceThe robot is
- Page 297 and 298: Maintenance2.3 Lubricating spring b
- Page 299 and 300: Maintenance2.7 Changing the battery
- Page 301 and 302: Troubleshooting ToolsCONTENTSPage1
- Page 303 and 304: Troubleshooting ToolsTroubleshootin
- Page 305 and 306: Troubleshooting Tools1.1 TestsMost
- Page 307 and 308: Troubleshooting Tools1.2.1 Entering
- Page 309 and 310: Troubleshooting Tools5. MC/ERWM RWM
Connecting Signals<strong>Installation</strong> <strong>and</strong> <strong>Commissioning</strong>The Profibus-DP system can communicate with a number of external devices. Theactual number depends on the number of process words occupied of each unit. Therobot can be equipped with one or two DSQC352. The Profibus-DP inputs <strong>and</strong> outputsare accessible in the robot as general inputs <strong>and</strong> outputs.For application data, refer to Profibus-DP, International St<strong>and</strong>ard, DIN 19245 Part 3.*1 - Note that the Profibus cable must be terminated in both ends.X20Profibus-DP Signal name Pin DescriptionShield 1 Cable screen591 6NC 2 Not connectedRxD/TxD-P 3 Receive/Transmit data PControl-P 4GND 5 Ground connection+ 5V DC 6NC 7 Not connectedRxd/TxD-N 8 Recieve/Transmit data NNC 9 Not connectedX3Profibus-DP supply Signal name Pin Description510 V DC 1 External supply of Profibus-DPNC 2 Not connectedGND 3 Ground connectionNC 4 Not connected+ 24 V DC 5 External supply of Profibus-DPDevice Net connector X5, see section 3.16.3 on page 51.78 Product Manual IRB 1400