Installation and Commissioning
Installation and Commissioning Installation and Commissioning
Connecting SignalsInstallation and CommissioningX21Interbus-S OUT Signal name Pin DescriptionTPDO2 1 Communication line TPDO2591 6TPDI2 2 Communication line TPDI2GND 3 Ground connectionNC 4 Not connected+5V 5 +5VDCTPDO2-N 6 Communication line TPDO2-NTPDI2-N 7 Communication line TPDI2-NNC 8 Not connectedRBST 9 SynchronizationX3Interbus-S supply Signal name Pin Description510 V DC 1 External supply of Interbus-SNC 2 Not connectedGND 3 Ground connectionNC 4 Not connected+ 24 V DC 5 External supply of Interbus-SNOTE! External supply is recommended to prevent loss of fieldbus at IRB power off.76 Product Manual IRB 1400
Installation and CommissioningConnecting Signals3.17.3 Profibus-DP, slave, DSQC352The unit can be operated as a slave for a Profibus-DP system.Technical dataSee Profibus-DP specification, DIN E 19245 part 3.Further informationFor setup parameters, see User’s Guide, section System Parameters, Topic: IO Signals.Circuit diagram, see chapter 11.Customer connectionsX20ProfibusconnectionPROFIBUS ACTIVENSMSCAN TxCAN RxPOWERX20ProfibusDSQC 352 ABB Flexible AtomationX5X3Figure 49 DSQC352, location of connectorsCommunication conceptX5 - DeviceNetconnectorX3 - PowerconnectorMaster PLC256 in/256 outRobot 1Robot 1Word 1:8 .3 Word 9:16 .7128 in/128 outRobot 2.11Word 17:24*1 *1Figure 50 Profibus-DP communication conceptProduct Manual IRB 1400 77
- Page 207 and 208: Installation and CommissioningOn-Si
- Page 209 and 210: Installation and CommissioningOn-Si
- Page 211 and 212: Installation and CommissioningOn-Si
- Page 213 and 214: Installation and CommissioningConne
- Page 215 and 216: Installation and CommissioningConne
- Page 217 and 218: Installation and CommissioningConne
- Page 219 and 220: Installation and CommissioningConne
- Page 221 and 222: Installation and CommissioningConne
- Page 223 and 224: Installation and CommissioningConne
- Page 225 and 226: Installation and CommissioningConne
- Page 227 and 228: Installation and CommissioningConne
- Page 229 and 230: Installation and CommissioningConne
- Page 231 and 232: Installation and CommissioningConne
- Page 233 and 234: Installation and CommissioningConne
- Page 235 and 236: Installation and CommissioningConne
- Page 237 and 238: Installation and CommissioningConne
- Page 239 and 240: Installation and CommissioningConne
- Page 241 and 242: Installation and CommissioningConne
- Page 243 and 244: Installation and CommissioningConne
- Page 245 and 246: Installation and CommissioningConne
- Page 247 and 248: Installation and CommissioningConne
- Page 249 and 250: Installation and CommissioningConne
- Page 251 and 252: Installation and CommissioningConne
- Page 253 and 254: Installation and CommissioningConne
- Page 255 and 256: Installation and CommissioningConne
- Page 257: Installation and CommissioningConne
- Page 261 and 262: Installation and CommissioningConne
- Page 263 and 264: Installation and CommissioningConne
- Page 265 and 266: Installation and CommissioningConne
- Page 267 and 268: Installation and CommissioningInsta
- Page 269 and 270: Installation and CommissioningInsta
- Page 271 and 272: Installation and CommissioningInsta
- Page 273 and 274: Installation and CommissioningExter
- Page 275 and 276: Installation and CommissioningExter
- Page 277 and 278: Installation and CommissioningExter
- Page 279 and 280: Installation and CommissioningExter
- Page 281 and 282: Installation and CommissioningExter
- Page 283 and 284: Installation and CommissioningExter
- Page 285 and 286: Installation and CommissioningExter
- Page 287 and 288: Installation and CommissioningExter
- Page 289 and 290: Installation and CommissioningExter
- Page 291 and 292: Installation and CommissioningExter
- Page 293 and 294: MaintenanceCONTENTSPage1 Maintenanc
- Page 295 and 296: MaintenanceMaintenanceThe robot is
- Page 297 and 298: Maintenance2.3 Lubricating spring b
- Page 299 and 300: Maintenance2.7 Changing the battery
- Page 301 and 302: Troubleshooting ToolsCONTENTSPage1
- Page 303 and 304: Troubleshooting ToolsTroubleshootin
- Page 305 and 306: Troubleshooting Tools1.1 TestsMost
- Page 307 and 308: Troubleshooting Tools1.2.1 Entering
Connecting Signals<strong>Installation</strong> <strong>and</strong> <strong>Commissioning</strong>X21Interbus-S OUT Signal name Pin DescriptionTPDO2 1 Communication line TPDO2591 6TPDI2 2 Communication line TPDI2GND 3 Ground connectionNC 4 Not connected+5V 5 +5VDCTPDO2-N 6 Communication line TPDO2-NTPDI2-N 7 Communication line TPDI2-NNC 8 Not connectedRBST 9 SynchronizationX3Interbus-S supply Signal name Pin Description510 V DC 1 External supply of Interbus-SNC 2 Not connectedGND 3 Ground connectionNC 4 Not connected+ 24 V DC 5 External supply of Interbus-SNOTE! External supply is recommended to prevent loss of fieldbus at IRB power off.76 Product Manual IRB 1400