12.07.2015 Views

Installation and Commissioning

Installation and Commissioning

Installation and Commissioning

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Connecting Signals<strong>Installation</strong> <strong>and</strong> <strong>Commissioning</strong>24 V I/Oor external supply0 VEncoderSynch switch24 V DC0 VAB24 V DC0 V10-16 not to be used12345678910111213141516Encoder unitOptoOptoOptoOptoOptoOptoGalvanicinsulationFigure 44 Encoder connections.The wiring diagram in Figure 44 shows how to connect the encoder <strong>and</strong> start signalswitch to the encoder unit. As can be seen from the illustration, the encoder is suppliedwith 24 VDC <strong>and</strong> 0V. The encoder output 2 channels, <strong>and</strong> the on-board computer usesquadrature decoding (QDEC) to compute position <strong>and</strong> direction.64 Product Manual IRB 1400

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!