Connecting Signals<strong>Installation</strong> <strong>and</strong> <strong>Commissioning</strong>Space for cable gl<strong>and</strong>sPrepared for furtherconnectorsXS 3 (safety)XS 5 (customer signals)XS17,CAN bus connectorXS 6 (customer power)XS 7 (external axes)XS 8, Position switchXS 1, Motor cableXS 2, Measurement systemcableFigure 26 Positions for connections on the left-h<strong>and</strong> side of the controller.34 Product Manual IRB 1400