Installation and Commissioning
Installation and Commissioning Installation and Commissioning
On-Site InstallationInstallation and Commissioning7. Confirm by pressing OK. A window like the one in Figure 23 appears.Rev. Counter Update!IRBThe Rev. Counter for all marked axeswill be update.It cannot be undone.OK to continue?CancelOKFigure 23 The dialog box used to start updating the revolution counter.8. Start the update by pressing OK.If a revolution counter is incorrectly updated, it will cause incorrect positioning.Thus, check the calibration very carefully after each update. Incorrect updatingcan damage the robot system or injure someone.9. Check the calibration as described in Chapter 2.15.3, Checking the calibration position.10.Save the system parametrs on floppy disk.28 Product Manual IRB 1400
Installation and CommissioningOn-Site InstallationFigure 24 Calibration marks on the manipulator.Product Manual IRB 1400 29
- Page 159 and 160: To the User“Declaration by the ma
- Page 161 and 162: System DescriptionCONTENTSPage1 Str
- Page 163 and 164: System DescriptionStructure1 Struct
- Page 165 and 166: System DescriptionStructureAxis 3Up
- Page 167 and 168: System DescriptionStructure1.2 Cont
- Page 169 and 170: System DescriptionStructureLithium
- Page 171 and 172: System DescriptionComputer System2
- Page 173 and 174: System DescriptionServo System3 Ser
- Page 175 and 176: System DescriptionI/O System4 I/O S
- Page 177 and 178: System DescriptionSafety System5 Sa
- Page 179 and 180: System DescriptionSafety System5.4
- Page 181 and 182: System DescriptionExternal Axes6 Ex
- Page 183 and 184: Installation and CommissioningCONTE
- Page 185 and 186: Installation and CommissioningCONTE
- Page 187 and 188: Installation and CommissioningTrans
- Page 189 and 190: Installation and CommissioningOn-Si
- Page 191 and 192: Installation and CommissioningOn-Si
- Page 193 and 194: Installation and CommissioningOn-Si
- Page 195 and 196: Installation and CommissioningOn-Si
- Page 197 and 198: Installation and CommissioningOn-Si
- Page 199 and 200: Installation and CommissioningOn-Si
- Page 201 and 202: Installation and CommissioningOn-Si
- Page 203 and 204: Installation and CommissioningOn-Si
- Page 205 and 206: Installation and CommissioningOn-Si
- Page 207 and 208: Installation and CommissioningOn-Si
- Page 209: Installation and CommissioningOn-Si
- Page 213 and 214: Installation and CommissioningConne
- Page 215 and 216: Installation and CommissioningConne
- Page 217 and 218: Installation and CommissioningConne
- Page 219 and 220: Installation and CommissioningConne
- Page 221 and 222: Installation and CommissioningConne
- Page 223 and 224: Installation and CommissioningConne
- Page 225 and 226: Installation and CommissioningConne
- Page 227 and 228: Installation and CommissioningConne
- Page 229 and 230: Installation and CommissioningConne
- Page 231 and 232: Installation and CommissioningConne
- Page 233 and 234: Installation and CommissioningConne
- Page 235 and 236: Installation and CommissioningConne
- Page 237 and 238: Installation and CommissioningConne
- Page 239 and 240: Installation and CommissioningConne
- Page 241 and 242: Installation and CommissioningConne
- Page 243 and 244: Installation and CommissioningConne
- Page 245 and 246: Installation and CommissioningConne
- Page 247 and 248: Installation and CommissioningConne
- Page 249 and 250: Installation and CommissioningConne
- Page 251 and 252: Installation and CommissioningConne
- Page 253 and 254: Installation and CommissioningConne
- Page 255 and 256: Installation and CommissioningConne
- Page 257 and 258: Installation and CommissioningConne
- Page 259 and 260: Installation and CommissioningConne
<strong>Installation</strong> <strong>and</strong> <strong>Commissioning</strong>On-Site <strong>Installation</strong>Figure 24 Calibration marks on the manipulator.Product Manual IRB 1400 29