12.07.2015 Views

Installation and Commissioning

Installation and Commissioning

Installation and Commissioning

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

On-Site <strong>Installation</strong><strong>Installation</strong> <strong>and</strong> <strong>Commissioning</strong>2.5 Stress forces2.5.1 StiffnesThe stiffnes of the foundation must be designed to minimize the influence on thedynamic behaviour of the robot.TuneServo can be used for adapting the robot tuning to a non-optimal foundation.2.5.2 IRB 1400(H)Force Endurance load Max. load(In operation)(Emergency stop)Fxy ± 1500 N ± 2000 NFz (upright) 2800 ± 500 N 2800 ± 700 NFz (suspended) - 2800 ± 800 N - 2800 ± 1000 NTorqueMxy ± 1800 Nm ± 2000 NmMz ± 400 Nm ± 500 NmFxy <strong>and</strong> Mxy are vectors that can have any direction in the xy plane.XZFigure 6 The directions of the stress forces.12 Product Manual IRB 1400

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!