12.07.2015 Views

Installation and Commissioning

Installation and Commissioning

Installation and Commissioning

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Transporting <strong>and</strong> Unpacking<strong>Installation</strong> <strong>and</strong> <strong>Commissioning</strong>1.3 Transport locking deviceAt delivey, axis 2 (= lower arm) is equipped with a transport locking device(see Figure 1).Remove the transport locking device before operating the robot.Transport lockingdeviceFigure 1 Transport locking device, axis 2.6 Product Manual IRB 1400

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!