Installation and Commissioning
Installation and Commissioning Installation and Commissioning
Installation and CommissioningCONTENTSPage4 Product Manual IRB 1400
Installation and CommissioningTransporting and Unpacking1 Transporting and UnpackingNB:Before starting to unpack and install the robot, read the safety regulations andother instructions very carefully. These are found in separate sections in theUser’s Guide and Product manual.The installation shall be made by qualified installation personnel and should conformto all national and local codes.When you have unpacked the robot, check that it has not been damaged duringtransport or while unpacking.Operating conditions:Ambient temperatureRelative humidity+5° to + 45° C (manipulator)+5° to + 52° C (controller)Max. 95% at constant temperatureStorage conditions:If the equipment is not going to be installed straight away, it must be stored in a dryarea at an ambient temperature between -25°C and +55°C.When air transport is used, the robot must be located in a pressure-equalized area.The net weight of the manipulator is approximately: 225 kgThe control system weighs approximately: 240 kg.Whenever the manipulator is transported, axis 2 must be bent backwards and axis 3positioned as low as possible.1.1 Stability / risk of tippingWhen the manipulator is not fastened to the floor and standing still, the manipulatoris not stable in the whole working area. When the arms are moved, care mustbe taken so that the centre of gravity is not displaced, as this could cause themanipulator to tip over.1.2 System diskettesThe diskettes in the box, fixed to the shelf for the teach pendant, should be copied(in a PC) before they are used. Never work with the original diskettes. When you havemade copies, store the originals in a safe place.Do not store diskettes inside the controller due to the high temperatures there.Product Manual IRB 1400 5
- Page 135 and 136: RobView 3.1File managerWhen the use
- Page 137 and 138: RobView 3.1In addition, also a butt
- Page 139 and 140: RobView 3.1Technical specificationP
- Page 141 and 142: DDE Server 2.3SCWriteThe user can a
- Page 143 and 144: DDE Server 2.3DDE Server for multip
- Page 145 and 146: SafetyCONTENTSPage1 General........
- Page 147 and 148: SafetySafety1 GeneralThis informati
- Page 149 and 150: Safety5 Safe Working ProceduresSafe
- Page 151 and 152: Safety7.2 Emergency stopsAn emergen
- Page 153 and 154: SafetyWhen the Hold-to-run control
- Page 155 and 156: Safety8.2 Tools/workpiecesIt must b
- Page 157 and 158: Safety- The external voltage connec
- Page 159 and 160: To the User“Declaration by the ma
- Page 161 and 162: System DescriptionCONTENTSPage1 Str
- Page 163 and 164: System DescriptionStructure1 Struct
- Page 165 and 166: System DescriptionStructureAxis 3Up
- Page 167 and 168: System DescriptionStructure1.2 Cont
- Page 169 and 170: System DescriptionStructureLithium
- Page 171 and 172: System DescriptionComputer System2
- Page 173 and 174: System DescriptionServo System3 Ser
- Page 175 and 176: System DescriptionI/O System4 I/O S
- Page 177 and 178: System DescriptionSafety System5 Sa
- Page 179 and 180: System DescriptionSafety System5.4
- Page 181 and 182: System DescriptionExternal Axes6 Ex
- Page 183 and 184: Installation and CommissioningCONTE
- Page 185: Installation and CommissioningCONTE
- Page 189 and 190: Installation and CommissioningOn-Si
- Page 191 and 192: Installation and CommissioningOn-Si
- Page 193 and 194: Installation and CommissioningOn-Si
- Page 195 and 196: Installation and CommissioningOn-Si
- Page 197 and 198: Installation and CommissioningOn-Si
- Page 199 and 200: Installation and CommissioningOn-Si
- Page 201 and 202: Installation and CommissioningOn-Si
- Page 203 and 204: Installation and CommissioningOn-Si
- Page 205 and 206: Installation and CommissioningOn-Si
- Page 207 and 208: Installation and CommissioningOn-Si
- Page 209 and 210: Installation and CommissioningOn-Si
- Page 211 and 212: Installation and CommissioningOn-Si
- Page 213 and 214: Installation and CommissioningConne
- Page 215 and 216: Installation and CommissioningConne
- Page 217 and 218: Installation and CommissioningConne
- Page 219 and 220: Installation and CommissioningConne
- Page 221 and 222: Installation and CommissioningConne
- Page 223 and 224: Installation and CommissioningConne
- Page 225 and 226: Installation and CommissioningConne
- Page 227 and 228: Installation and CommissioningConne
- Page 229 and 230: Installation and CommissioningConne
- Page 231 and 232: Installation and CommissioningConne
- Page 233 and 234: Installation and CommissioningConne
- Page 235 and 236: Installation and CommissioningConne
<strong>Installation</strong> <strong>and</strong> <strong>Commissioning</strong>CONTENTSPage4 Product Manual IRB 1400