occurred in the southeast corner of the line 401 blend room, another confined area. The firewall south of<br />

line 401 was partially collapsed, <strong>and</strong> concrete blocks dislodged from this wall fell to the south. The force<br />

of the dust explosion pressure wave likely bent a steel column on the west side of the blend room<br />

(Figure 8). Metal panels of the north <strong>and</strong> west walls were deformed outward. A large hole was blown in<br />

the building roof above the southeast corner of the blend room.<br />

Figure 8. Bent support column in line 401 blend room.<br />

Line 416 operators observed a fireball traveling north toward them from the line 401 blend room. They<br />

stated that the fireball receded when it reached the end of the line 401 oven. Still, the effects of the<br />

pressure wave that accompanied the fireball knocked some of them down. That wave vented out of the<br />

building at the northwest corner, where it damaged a loading dock door. It also blew out portions of the<br />

plant’s metal panel west wall (Figure 9) <strong>and</strong> damaged the north wall of the chemical room, located near<br />

the southwest corner of the plant.<br />

At the time of the secondary dust explosions, line 401 had been running for a few minutes. Three<br />

operators at this location were severely burned (Figure 5); they received extended treatment from the<br />

hospital. Two other operators received minor injuries.<br />