forklift with a semi-enclosed cab down the aisle west of line 405, was also burned. He was hospitalized<br />
but released the same day.<br />
Figure 4. Fire damage to inlet duct of line 405 baghouse.<br />
Figure 5 depicts the sequence of explosions <strong>and</strong> shows the likely locations of those who were burned in<br />
the production area. See Section 5.4 for a description of the extent of injuries to employees.<br />
Eyewitnesses st<strong>and</strong>ing northwest of line 405 felt a pressure wave blow dust <strong>and</strong> other material in their<br />
direction. The force shook loose accumulated dust from the overhead roof joists <strong>and</strong> blew out roof<br />
panels. Employees also saw a fireball coming toward them from the south side of the line 405 oven; the<br />
fireball dissipated when it reached the molding department. Employees reported that dust fell from<br />
above, the lights went out, <strong>and</strong> the building fire sprinkler system activated.<br />
35