eams. Nonload-bearing masonry block walls with a 2-hour fire resistance rating partially segregated<br />
functional areas of the plant.<br />
3.4.2 Plant Layout<br />
Four production lines—401, 402, 403, <strong>and</strong> 405—were located in the center portion of the southern half of<br />
the plant. Production line 416 was located near the west wall (Figure 1). The production lines included<br />
material feeders, separating <strong>and</strong> mixing machines, curing ovens, <strong>and</strong> trimming equipment connected by<br />
conveyors. Lines 401, 402, <strong>and</strong> 403 were adjacent to each other; line 405 was approximately 80 feet east<br />
of line 403. The open area between lines 403 <strong>and</strong> 405 was used to store racks of semi-cured acoustical<br />
insulation, referred to as “pelts.” The molding department, where hydraulic molding presses <strong>and</strong> water jet<br />
cutters were used to shape <strong>and</strong> size the automotive insulation products, was located in the northeast<br />
quadrant of the plant.<br />
19